48th Street Sewer Improvements
Fife, WA
Sewer Utility Engineering
KPG provided survey, design, and construction management services for the installation of 6,000 LF of new eight to 16 inch sewer main and appurtenances along the City of Fife’s 48th Street E. In addition to that, 3,000 LF of new 12 inch ductile iron water main line, services, hydrants, and air/vacuum release valves were replaced. The project included the preparation of dewatering criteria and soil stabilization measures for deep sewer installation, replacement of manholes and side sewers.
Upgrades within the corridor included sidewalk and curb ramp improvements for ADA compliance and other restoration work.